Lucerne V6-3.8L VIN 2 (2006)
![background image](/buick/lucerne/v6-3.8l_vin_2/Page-2350009.png)
14. Connect the EVAP pipe quick connect fitting (2) to the purge solenoid.
15. Install the brake booster vacuum hose to the upper intake manifold fitting.
16. Install the fuel rail assembly.
17. Install the air cleaner outlet duct.