buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Starter Solenoid|Service and Repair|Page 15586 > < Starter Solenoid|Service and Repair|Page 15584
Page 4
background image

7. Install the starter cable to the generator.
8. Install the generator terminal nut.

Tighten the nut to 20 N.m (15 lb ft).

9. Position the starter cable boot.

10. Install the starter cable retainer (6) to the side rail.
11. Install the starter cable retainer (2) to the BEC housing.
12. Install the starter cable retainer (1) to the tie bar.
13. Position the starter cable terminal (5) to the side rail.
14. Install the starter cable bolt (7) to the side rail.

Tighten the bolt to 20 N.m (15 lb ft).

15. Install the starter cable to the BEC stud.
16. Install the nut (4) securing the starter cable (3) to the BEC.

Starter Solenoid|Service and Repair|Page 15586 > < Starter Solenoid|Service and Repair|Page 15584