Rainier 2WD V8-5.3L VIN P (2004)
1. Install the insulator (1) on the EVAP canister purge solenoid (3).
2. Install the EVAP canister purge solenoid (3).
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the EVAP canister purge solenoid bolt (2).
Tighten
Tighten the bolt to 10.5 N.m (93 lb in).
4. Connect the EVAP purge solenoid electrical connector (1).
5. Connect the EVAP pipe to the EVAP purge solenoid.