Rainier 2WD V8-5.3L VIN P (2004)
3. Install the fuse relay center bolts (3).
Tighten the relay center bolts to 6 N.m (53 lb in).
4. Install the harness end bolts (2).
5. Install the fuse relay center cover (1) over the relay center bolts. Press downward to engage the tabs.
6. Install the junction block cover. Press downward to engage the tabs.