Rainier AWD V8-5.3L VIN P (2004)
11. When deploying the side impact module-left, refer to the following instructions:
-
Place the J 39401-8 SIR deployment fixture (3) in the center of the cleared area.
-
Fill the deployment fixture with water or sand.
-
Mount the side impact module-left (1) in the deployment fixture (3) with the vinyl/plastic trim cover facing up.
-
Adjust and secure the J 39401-8 arms (4) to the deployment fixture (3).
-
To mount, use 2 m 6 x 1.0 nuts (2) with washers in order to secure the side impact module-left (1) to the deployment fixture arms (4).
-
Securely tighten all fasteners prior to deployment.
12. Inspect the J38826 SIR deployment harness (1) and the appropriate pigtail adapter(2) for damage. Replace as needed.
13. Short the 2 SIR deployment harness (1) leads together using one banana plug seated into the other.
14. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).