buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Relays and Modules - Power and Ground Distribution > < HVAC System - Manual|Page 210
Page 2
background image

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Install the forward mounting screws.

Tighten the screws to 1.8 N.m (16 lb in).

4. Connect the electrical connector to the blower control processor assembly.
5. Install the blower motor to the HVAC module assembly.
6. Install the blower motor mounting screws.

Tighten the screws to 1.8 N.m (16 lb in).

7. Connect the blower motor electrical connector.
8. Install the right side I/P insulator.

Relays and Modules - Power and Ground Distribution > < HVAC System - Manual|Page 210