buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Heater Control Valve > < 09-06-03-004D|Page 4698
Page 3
background image

D. Install nut (76) at evaporator inlet port.

Tighten
^

Nut (76) to 16 Nem (12 lb. ft.).

4. Refrigerant.

^

Evacuate and charge system.

5. Test system performance.

Heater Control Valve > < 09-06-03-004D|Page 4698