Roadmaster Estate Wagon V8-350 5.7L (1993)
are using.
Step 6: Tape the Splice
Fig. 11 Proper First Taping
Fig. 12 Proper Second Taping
Center and roll the splicing tape. The tape should cover the entire splice. Roll on enough tape to duplicate the thickness of the insulation on the
existing wires. Do not flag the tape. Flagged tape may not provide enough insulation, and the nagged ends will tangle with the other wires in the
harness, Fig. 11.
If the wire does not belong in a conduit or other harness covering, tape the wire again. Use a winding motion to cover the first piece of tape, Fig.
12.