buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Relays and Modules - Body and Frame > < 08-08-51-002|Page 13384
Page 7
background image

^

Allow 30 minutes drying time.

10.

In a well ventilated area, start engine and allow to idle for up to 30 minutes until paint is cured and dry.

Important

Some "smoking" will occur while curing the paint with the engine running.

The paint can be heated and cured while driving, but be careful not to get the exhaust system wet during the first 30 minutes.

Warranty Information

Labor

Material 

Operation

Labor Time

Allowance

A6150

0.6 hr - Single Exhaust

GC

Add

0.2 hr - Dual Exhaust

GC

Important

While the above procedure and materials are correct for vehicles from 1993 to 1998, the Labor Operation and Time Allowance only pertains to
vehicles in the Warranty period.

*

We believe this source and their equipment to be reliable. There may be additional manufacturers of such equipment. General Motors does not
endorse, indicate any preference for or assume any responsibility for the products or equipment from these firms or for any such items which may be
available from other sources.

Relays and Modules - Body and Frame > < 08-08-51-002|Page 13384