DeVille V8-4.6L VIN Y (1998)
8. Remove the lower channel plate and the valve body and accumulator assembly from the case:
INSTALLATION PROCEDURE
1. Position the low reverse band, using a piece of shim stock (shim thickness 0.508 - 0.762 mm (0.020 - 0.030 inch) .
2. Place the lower controls against the forward support studs.
3. Hand-start the bolts into the channel plate. Bolts without a flange are next to the transfer plate.
4. Remove the shim stock.
5. Place the oil transfer plate over the open gasket area. Hand-start the bolts to hold the plate in place. Note the installation order of the alignment
bolts.
6. Install the 2 nuts on the forward support studs.
^
Tighten the bolts and nuts to 8 Nm (71 inch lbs.).
NOTICE: Refer to Fastener Notice in Service Precautions.