Avalanche 1500 2WD V8-5.3L VIN Z Flex Fuel (2005)
5. Disconnect the intermediate cable from the front cable.
6. Remove the intermediate cable.
Installation Procedure
1. Install the intermediate cable.
2. Connect the intermediate cable to the front cable.
3. Connect the equalizer to the rear park brake cables.