chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Charging System > < Technician Safety Information|Page 7939
Page 5
background image

18. Install the positive battery cable (1) into the junction block.
19. Snap the junction block cover closed.
20. If necessary, install the engine sight shield.

21. Tighten the positive cable bolt at the UBEC.

Tighten the bolt to 9 N.m (80 lb in).

22. Connect the positive battery cable.

Tighten the bolt to 17 N.m (13 lb ft).

23. Snap the positive battery cable cap closed.
24. Connect the negative battery cable.

Charging System > < Technician Safety Information|Page 7939