C 1500 Truck 2WD V8-5.3L VIN T (1999)
INSTALLATION PROCEDURE
1. Install the side window air outlet duct.
2. Install the air tube to the side window outlet duct.
3. Install the instrument panel carrier.
INSTALLATION PROCEDURE
1. Install the side window air outlet duct.
2. Install the air tube to the side window outlet duct.
3. Install the instrument panel carrier.