chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6760 > < Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6755
Page 1
background image

Air Injection Control Valve: Service and Repair
Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement

REMOVAL PROCEDURE

1. Remove the hose clamp (12) from the AIR shut-off valve outlet hose (10).
2. Remove the hose from the shut-off valve (13).
3. Release the retaining clip (11) for the outlet hose.
4. Remove the hose clamp at the crossover pipe.
5. Remove the shut-off valve outlet hose from the vehicle.

INSTALLATION PROCEDURE

Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6760 > < Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6755