chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Ball Joints (Greaseable) - Added Service Requirements|Page 6824 > < Ball Joints (Greaseable) - Added Service Requirements|Page 6822
Page 23
background image

Figure 6

b. Support upper control arm and punch rivets out using a punch (Fig. 6).

Figure 12

9.

Install new upper ball joint (Fig. 12, 115) to upper control arm (Fig. 12, 101 - C Truck arm shown, K Truck arm typical).

a. Position four (4) attaching bolts (pointing upward), washers and nuts.

b. Tighten nuts (A) to 23 N-m (17 lb.ft.).

Ball Joints (Greaseable) - Added Service Requirements|Page 6824 > < Ball Joints (Greaseable) - Added Service Requirements|Page 6822