chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Fluid - A/T|Capacity Specifications|Page 1372 > < Fluid - A/T|Capacity Specifications|Page 1370
Page 6
background image

3. Turn the main function switch to the FLUSH position. Allow the machine to operate for 30 seconds.

4. Turn the main function switch to the IDLE position and allow the supply vessel pressure to dissipate.

Forward Flush

Fluid - A/T|Capacity Specifications|Page 1372 > < Fluid - A/T|Capacity Specifications|Page 1370