chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Relay Module > < Navigation Module|Service and Repair
Page 2
background image

1. Install the bracket to the I/P structure.

Notice:  Refer to Fastener Notice.

2. Install the nuts (1) retaining the bracket to I/P structure.

Tighten the fasteners to 9 N.m (80 lb in).

3. Install the VCIM.

Relay Module > < Navigation Module|Service and Repair