chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Air Conditioning Compressor and Condenser Hose Replacement|Page 1047 > < Air Conditioning Compressor and Condenser Hose Replacement|Page 1045
Page 2
background image

4. Install the 11.96 mm (0.471 in) screen in the middle of the reduced diameter point of the fitting.

5. Place the suction hose side of the manifold into the GE-44551-5 - installation tool fixture  (3) so it is supported by the tools legs.

Note:  Correct placement of the GE-44551-5 - installation tool fixture is critical.

6. Lubricate the A/C suction screen with the applicable refrigerant oil.
7. Align the screen (2), basket first into the suction hose bore then hand tighten the bolt until contact is made between the hose, screen and tool.
8. Turn the bolt of the installation tool clockwise pressing the screen into the bore until the mandrel shoulder contacts the end of the hose fitting.
9. Unscrew the bolt and remove the installation tool from the manifold.

Note:  Clean the surface to be used for attaching the label.

10. Install the GE-44551-1 - Suction Screen Notification Label.
11. Install the A/C compressor and condenser hose to the A/C compressor. Refer to Air Conditioning Compressor and Condenser Hose Replacement

(1.4L LUJ)   (See: Heating and Air Conditioning/Compressor HVAC/Service and Repair/Removal and Replacement/Air Conditioning Compressor
and Condenser Hose Replacement)Air Conditioning Compressor and Condenser Hose Replacement (1.8L LUW)   (See: Heating and Air
Conditioning/Compressor HVAC/Service and Repair/Removal and Replacement/Air Conditioning Compressor and Condenser Hose Replacement
).

Air Conditioning Compressor and Condenser Hose Replacement|Page 1047 > < Air Conditioning Compressor and Condenser Hose Replacement|Page 1045