chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Dual Bed Cat Converters - Revised Repair Procedure|Page 2174 > < Dual Bed Cat Converters - Revised Repair Procedure|Page 2172
Page 4
background image

FIGURE 2 - CONVERTER BELT FLANGE

9.

Prop new converter up at a 45~ angle with upper bed fill hole at top. (See Figure 1 for a description of upper and lower beds.) Tap funnel
J-34155-3 into converter fill hole with hammer (Figure 2).

10.

Install packet of new upper bed beads from kit, P/N 25056590, into upper bed of the new converter.

FIGURE 3 - FULL CONVERTER

11.

Pour sifted upper bed beads (ref. Step 8) or new upper bed beads if required into upper bed of new converter. Tap belt flange of converter with
rubber mallet to allow beads to settle. Continue filling and tapping until converter is full. See Figure 3 for definition of full upper bed.

If upper bed is full, proceed to Step 12. If upper bed is not full, use leftover upper bed catalyst beads from involved dual bed converters to fill
upper bed. If there are not enough used upper bed beads, obtain upper bed bead kit, P/N 25056680 (zone approval is required to obtain this kit),
and continue to fill upper bed until full.

NOTICE:

Used upper bed beads (from non-damaged or expanded converters) can be mixed with new upper bed beads.  DO NOT MIX UPPER
AND LOWER BEADS. Also, do not mix any other catalyst beads from converters other than converters involved in this bulletin.
Store unused upper bed beads in a clean container marked "upper bed".

12.

Lay converter down on a flat surface with upper bed on top.

13.

Insert fill plug, P/N 8998202 (provided in kit, P/N 25056590), into upper bed fill hole. If outer rim of the fill plug doesn't fit flat against converter
shell, remove enough beads so it does.

Dual Bed Cat Converters - Revised Repair Procedure|Page 2174 > < Dual Bed Cat Converters - Revised Repair Procedure|Page 2172