chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Procedures|Page 15401 > < Procedures|Page 15399
Page 4
background image

5. Starting at the top, gently pull on the garnish molding to disengage the attaching clips.

Installation Procedure

1. Position the center pillar garnish molding over the lower garnish molding with the bottom tabs behind the lower molding.
2. Gently push at the clip locations to install the garnish molding.
3. Insert the weatherstripping over the trim edge.
4. Install the fastener cover to the garnish molding.

5. Install the height adjuster knob.

Notice:  Refer to Fastener Notice   in Cautions and Notices.

6. Install the shoulder belt assembly and fasteners.

Tighten the fasteners to 50 N.m (37 lb ft).

Procedures|Page 15401 > < Procedures|Page 15399