Equinox FWD V6-3.4L VIN F (2005)
15. Install the liquid line to the strut tower.
16. Install the liquid line nut to the strut tower.
Tighten the nut to 8 N.m (70 lb in).
17. Connect the harness and vent hose retainers to the liquid line.
18. Install the surge tank.
19. Install the washer bottle.
20. Install the left headlamp.
21. Recharge the A/C system. Refer to Refrigerant Recovery and Recharging.
22. Test the affected A/C joints for leaks using J 39400-A