Express 1/2 Ton Van V6-4.3L VIN X (2003)
9. Install the fender wheelhouse extension (1).
10. Install the left front tire.
11. Lower the vehicle.
12. Connect the ECT gage sensor electrical connector.
13. Install the engine cover.
9. Install the fender wheelhouse extension (1).
10. Install the left front tire.
11. Lower the vehicle.
12. Connect the ECT gage sensor electrical connector.
13. Install the engine cover.