Express 1/2 Ton Van V8-5.7L VIN R (1999)
2. Connect the vacuum lines.
3. Connect the electrical connectors.
4. Roll the instrument panel upward. Refer to IP Carrier Replacement in Instrument Panel, Gauges and Console.
NOTE: Refer to Fastener Notice in Cautions and Notices.
5. Install the heater case retaining nuts (2) to the engine compartment.
Tighten
Tighten the nuts to 6 N.m (53 lb in).
6. Install the evaporator casing to the vehicle.
7. Connect the heater hoses from the heater core.
8. Recharge the refrigerant, if equipped with A/C. Refer to Refrigerant Recovery and Recharging in HVAC Systems with A/C-Manual.
9. Fill the engine coolant. Refer to Draining and Filling Cooling System in Engine Cooling.