Express 1/2 Ton Van V8-5.7L VIN R (1999)
7. Install the through-bolt and nut.
-
Tighten the bolts to 95 Nm (70 ft. lbs.).
8. Lower the vehicle.
9. Connect the battery negative cable.
7. Install the through-bolt and nut.
-
Tighten the bolts to 95 Nm (70 ft. lbs.).
8. Lower the vehicle.
9. Connect the battery negative cable.