Express 1/2 Ton Van V8-5.7L VIN R (1999)
-
Tighten the coupling shield retainer and the lock nut (2) to 109 Nm (80 ft. lbs.).
10. Refer to Pitman Shaft Over-Center Preload Adjustment - Off Vehicle to adjust the pitman shaft over-center preload.
-
Tighten the coupling shield retainer and the lock nut (2) to 109 Nm (80 ft. lbs.).
10. Refer to Pitman Shaft Over-Center Preload Adjustment - Off Vehicle to adjust the pitman shaft over-center preload.