chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Exhaust Gas Recirculation Valve Replacement|Page 5759 > < Exhaust Gas Recirculation Valve Replacement|Page 5757
Page 3
background image

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

1. If required, install the EGR bracket, the EGR bracket bolt, and nut. Tighten the bolt and nut to 25 Nm (18 lb ft).

2. Install NEW intake manifold tube gaskets (1) as required.
3. Position the EGR valve (3) to the EGR cooler tube (4).
4. Install the EGR valve to EGR cooler tube bolts (2) and tighten to 20 Nm (15 lb ft).
5. Install the EGR valve/cooler. Refer to Exhaust Gas Recirculation Valve Cooler Replacement   (See: EGR Cooler/Service and Repair/Exhaust Gas

Recirculation Valve Cooler Replacement).

6. Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill)   (See: Engine, Cooling and Exhaust/Cooling System/Service

and Repair/Procedures/Cooling System Draining and Filling (Static Fill)) Cooling System Draining and Filling (Vac N Fill)   (See: Engine,
Cooling and Exhaust/Cooling System/Service and Repair/Procedures/Cooling System Draining and Filling (Vac N Fill)) Cooling System Draining
and Filling (Static Fill LGH)   (See: Engine, Cooling and Exhaust/Cooling System/Service and Repair/Procedures/Cooling System Draining and
Filling (Static Fill VIN L)).

Exhaust Gas Recirculation Valve Replacement|Page 5759 > < Exhaust Gas Recirculation Valve Replacement|Page 5757