chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Procedures|Page 6003 > < Procedures|Page 6001
Page 27
background image

9. Position the engine wiring harness, and install the engine wiring harness bracket fasteners (1) and tighten to 21 Nm (15 lb ft).

10. Install the exhaust gas recirculation bracket. Refer to Exhaust Gas Recirculation Valve Bracket Replacement   (See: Emission Control

Systems/Exhaust Gas Recirculation/EGR Valve/Service and Repair/Exhaust Gas Recirculation Valve Bracket Replacement).

11. Install the upper fan shroud. Refer to Engine Coolant Fan Upper Shroud Replacement (4.3L, 4.8L, 5.3L, 6.0L, 6.2L, 7.0L)   (See: Engine, Cooling

and Exhaust/Cooling System/Fan Shroud/Service and Repair/Engine Coolant Fan Upper Shroud Replacement) Engine Coolant Fan Upper Shroud
Replacement (Diesel)   (See: Engine, Cooling and Exhaust/Cooling System/Fan Shroud/Service and Repair/Engine Coolant Fan Upper Shroud
Replacement).

12. If the fuel injectors were replaced, refer to Fuel Injector Flow Rate Programming   (See: Procedures).
13. Prime the fuel system. Refer to Fuel System Priming   (See: Service and Repair/Fuel System Priming).
14. Start the engine. If the engine stalls, repeat the above step.
15. Once the engine starts, inspect for fuel leaks.

VIN 6

Fuel Injector Replacement (Right)

Special Tools 

*

EN-47909  Injector Bore and Sleeve Cleaning Kit

*

J-46594  Fuel Injector Puller

Removal Procedure

Procedures|Page 6003 > < Procedures|Page 6001