Express 3/4 Ton Van V8-305 5.0L VIN M SFI (1999)
10. Remove the throttle body fasteners.
11. Remove the throttle body assembly.
12. Remove and discard the flange seal.
INSTALLATION PROCEDURE
1. Clean the seal surface on the intake manifold.
2. Install a new flange seal.
3. Install the throttle body assembly.