Express 3/4 Ton Van V8-4.8L VIN V (2003)
Notice: Refer to Fastener Notice in Service Precautions.
4. Install the intake manifold bolts.
4.1.
Tighten the intake manifold bolts a first pass in sequence to 5 Nm (44 inch lbs.).
4.2.
Tighten the intake manifold bolts a final pass in sequence to 10 Nm (89 inch lbs.).
5. Install the EVAP purge solenoid (3), isolator (1) and bolt (2) to the intake manifold.
^
Tighten the EVAP purge solenoid bolt to 10 Nm (89 inch lbs.).
6. Install the EVAP purge solenoid vent tube to the solenoid (1) and vapor pipe.