Express 3/4 Ton Van V8-5.7L VIN R (1998)
1. Install the upper intake manifold to the engine.
Refer to Intake Manifold Assemble under Engine Unit Repair.
2. Install the accelerator control cable bracket to the throttle body.
-
Tighten the nuts to 10 Nm (88 inch lbs.).
NOTICE: Refer to Fastener Notice in Service Precautions.
3. Install the accelerator control cable and the cruise control cable, if equipped, to the throttle shaft.
4. Install the canister purge solenoid to the engine.
5. Install the fuel pipes to the rear of the engine.
6. Connect the spark plug wires to the left side of the distributor cap.
7. Install the PCV to the intake manifold. Twist to lock the PCV.
8. Install the vacuum brake booster hose to the intake manifold, if equipped.
9. Install the vacuum brake booster hose to the intake manifold, if equipped.
10. Connect the following electrical connectors:
-
Fuel injector electrical connector
-
Manifold Absolute Pressure (MAP) sensor
-
Canister purge solenoid
-
Idle Air Control (IAC) solenoid
-
Throttle Position (TP) sensor
11. Install the air cleaner intake duct.
12. Install the engine cover.
13. Connect the battery negative cable.