Express 3/4 Ton Van V8-5.7L VIN R (1998)
6. Install the pressure switch assembly.
7. Install the pressure switch assembly bolts.
8. Install the wiring harness, the TCC solenoid and the O-ring seal.
9. Install the wiring harness bolts.
10. Install the TCC solenoid bolts.
11. Connect the electrical connectors to the valve body components.