chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Fluid Pan, A/T > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 7787
Page 5
background image

Important:  The figures depict the improper installation of the cooler line into the quick connect fitting. Failure to follow the proper
installation procedure could result in separation of the cooler line to connector fitting.

4. Repeat step 3 for installation of the remaining cooler line ends to the remaining connectors fittings.
5. Bolt securing the clip to the engine.

Fluid Pan, A/T > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 7787