G 2500 3/4 Ton Van V8-6.5L DSL Turbo VIN F (1997)
Exhaust Pipe/Muffler Hanger: Service and Repair
Frame
REMOVAL
1. Raise and suitably support the vehicle on a hoist.
2. The exhaust system as necessary.
3. The bolts retaining the heat shields.
4. The heat shield.
INSTALLATION
1. The heat shield.
2. The heat shield bolts.
^
Tighten the heat shield retaining bolt to 12 Nm (106 inch lbs.).
3. The exhaust system as necessary.
4. Lower the vehicle.