chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Customer Safety Information|Page 10545 > < Customer Safety Information|Page 10543
Page 6
background image

10. Position the harness to the engine. Install the engine wiring harness retainers to the tabs on the fuel rail.

Important:  Install the marked injector connectors to their corresponding injectors.

11. Connect the fuel injector electrical connectors (2, 4).
12. Connect the main ignition coil harness electrical connector (1).
13. Install the CPA retainer (3).

Important:  Install the marked injector connectors to their corresponding injectors.

Customer Safety Information|Page 10545 > < Customer Safety Information|Page 10543