chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Battery Negative Cable Disconnection and Connection|Page 14646 > < Battery Negative Cable Disconnection and Connection|Page 14644
Page 6
background image

12. Position the ground wire (5) and install the ground wire bolt (1) to the top rail.

Tighten the nut to 10 N.m (89 lb in).

13. Install the battery cable harness retaining clips (2, 3, and 4) to the front rail and fan shroud.

14. Install the positive battery cable terminal (2) to the BEC.
15. Install the positive battery cable junction block lead nut (1).

Tighten the nut to 10 N.m (89 lb in).

16. Install the BEC cover.

Battery Negative Cable Disconnection and Connection|Page 14646 > < Battery Negative Cable Disconnection and Connection|Page 14644