chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Body and Frame|Unibody > < Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 14213
Page 11
background image

Rear Body Opening Frame Mid-Gate Drain Valve Replacement

Removal Procedure

1. Lower the mid gate.

2. Raise the close out panel on the load floor grate and support in the raised position.

3. Using a flat bladed tool or suitable replacement to pry the front drain valve from the floor.
4. Remove the valve from the vehicle.

Installation Procedure

1. Install the mid gate drain valve into the floor.
2. Press down on the mid gate drain valve using firm pressure to firmly seat the valve into the floor.
3. Lower the load floor grate close out panel.
4. Close the mid gate.

Body and Frame|Unibody > < Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 14213