Metro L3-061 1.0L VIN 6 TBI (1998)
^
Allow 30 minutes drying time.
10.
In a well ventilated area, start engine and allow to idle for up to 30 minutes until paint is cured and dry.
Important:
Some "smoking" will occur while curing the paint with the engine running.
The paint can be heated and cured while driving, but be careful not to get the exhaust system wet during the first 30 minutes.
Warranty Information
Labor
Material
Operation
Labor Time
Allowance
A6150
0.6 hr - Single Exhaust
GC
Add
0.2 hr - Dual Exhaust
GC
Important:
While the above procedure and materials are correct for vehicles from 1993 to 1998, the Labor Operation and Time Allowance only pertains to
vehicles in the Warranty period.
*
We believe this source and their equipment to be reliable. There may be additional manufacturers of such equipment. General Motors does not
endorse, indicate any preference for or assume any responsibility for the products or equipment from these firms or for any such items which may be
available from other sources.