chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Procedures|Page 7094 > < Deployment Procedures
Page 2
background image

Description

11. Twist together one connector wire lead to one deployment wire (1). Secure the connection mechanically.
12. Bend the twisted connection (2) flat. Wrap the connection tightly and securely with electrical tape. The tape will also insulate the connection.
13. Secure the remaining connector wire lead (3) to the remaining deployment wire.

Description

14. Connect the deployment harness to the inflatable restraint steering wheel module, yellow 2-way connector at the base of the steering column.
15. Route the deployment harness out of the driver side of the vehicle.
16. Disconnect the inflatable restraint IP module, yellow connector. This connector is located behind the IP compartment.

17. Cut the inflatable restraint IP module harness connector from the vehicle. Leave at least 160 mm (6 in) of wire at the connector.
18. Strip 13 mm (0.5 in) of insulation from each wire lead of the connector.
19. Cut two 6.1 m (20 ft) deployment wires from 0.8 mm (18 gauge) or thicker multi-strand wire. Use these wires in order to fabricate the driver

deployment harness.

20. Strip 13 mm (0.5 in) of insulation from both ends of these two wires.

21. Short the wires by twisting together one end from each. Keep the deployment wires shorted. Do not connect these wires to a power source until

you are ready to deploy the air bag.

22. Twist together one connector wire lead to one deployment wire (1). Secure the connection mechanically.
23. Bend the twisted connection (2) flat. Wrap the connection tightly and securely with electrical tape. The tape will also insulate the connection.
24. Secure the remaining connector wire lead (3) to the remaining deployment wire.

Deployment Procedures|Page 7094 > < Deployment Procedures