chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Transfer Case - Increased Shift Effort From 2H to 4H|Page 956 > < Transfer Case - Increased Shift Effort From 2H to 4H|Page 954
Page 7
background image

Figure 3

INSTALL (Figures 2 & 3)

Tools required:
J8092  Drive handle 
J33790 Bearing installer and remover 
J33833 Bearing installer and remover

1. Front output bearing (61) to the new front case half P/N 15635347 (45) using J 8092 and J 33833.

2. New front output shaft seal P/N 15579788 (72) to the new front case half (45).

3. Front output bearing retainer ring (snap ring) (60) to the new case half.

4. New input seal P/N 14095609 (42) into retainer (44) if it was removed in step 24 above.

5. Input bearing (40) and input bearing retainer (39) to the new case half using J 36372.

6. Planetary carrier (36) and the input gear (38) to the annulus gear (62) using a soft hammer.

7. Retainer snap ring to the input gear (38). Input bearing retainer (44) and input bearing retainer bolts (43) to the front case half (45).

-

Clean mating surfaces and apply RTV or equivalent on bearing retainer mating surfaces.

NOTE Do not block oil feed hole from case to bearing retainer.

-

Apply Loctite 242 (R) or equivalent on bearing retainer bolts.

-

Tighten bolts to 19 N-m (14 lbs.ft.).

Transfer Case - Increased Shift Effort From 2H to 4H|Page 956 > < Transfer Case - Increased Shift Effort From 2H to 4H|Page 954