S10/T10 P/U 2WD V6-4.3L VIN W (1997)
^
Second to 16 Nm (12 ft. lbs.)
4. New EBCM gasket to EBCM.
NOTE:
^
Do not use RTV or any other sealant on the gasket or mating surfaces.
5. EBCM to BPMV.
^
Inspect Gasket to verify proper alignment.
6. Four new EBCM Torx(R) bolts.
^
Tighten Four bolts to 5 Nm (39 in. lbs.) in an X pattern.
7. Three 13 mm EHCU to base bracket retaining bolt.
^
Tighten three 13mm bolts to 9 Nm (7 ft. lbs.)
8. EHCU on to the vehicle.
9. Three 10mm bolts that fasten the EHCU bracket to the vehicle bracket.
10. Front and rear brake pipes to the combination valve.
^
Tighten brake pipe fittings to 29 Nm (22 ft. lbs.)
10. Three hydraulic lines to tube adapters on BPMV.
11. The 2-way connector to combination valve.
12. Four electrical connectors to the EBCM.
13. Negative battery cable.
14. Bleed the brake system.
^
Verify that the combination valve metering rod is depressed during bleeding.
15. Return to Diagnostic System Check.