chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Auxiliary Battery Positive Cable Replacement|Page 16480 > < Auxiliary Battery Positive Cable Replacement|Page 16478
Page 5
background image

3. Install the positive battery cable channel at the plenum front panel.
4. Install the positive battery cable clips to the studs on the plenum front panel.

5. Install the starter solenoid cable (1) terminal to the mega fuse stud.

Notice: Refer to Fastener Notice.

6. Install the starter solenoid cable nut (2) to the mega fuse. 

Tighten the nut to 9 N.m (80 lb in).

Auxiliary Battery Positive Cable Replacement|Page 16480 > < Auxiliary Battery Positive Cable Replacement|Page 16478