Silverado 1500 4WD V8-5.3L VIN T (2004)
2. Install the 2-3 shift solenoid (367A) and the 2-3 shift solenoid retainer (395).
3. Install the 1-2 shift solenoid (267A) and the 1-2 shift solenoid retainer (395).
4. Important:
When installing the pressure control solenoid, the electrical connector (2) must be in the position shown.
Install the pressure control solenoid (377).
5. Notice:
Refer to Fastener Notice in Service Precautions.
Install the pressure control solenoid retainer (378) and retainer bolt (364A).
^
Tighten the bolt to 11 Nm (97 inch lbs.).