chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Engine Block Valley Cover Replacement|Page 3919 > < Engine Block Valley Cover Replacement|Page 3917
Page 9
background image

1. If the intake manifold was replaced perform the following steps, otherwise proceed to step 21.

Note

Evenly push in the RED collar in order to install the nipple.

2. Install the brake booster vacuum hose nipple to the NEW intake manifold.

3. Install NEW fuel injector lower O-ring seals onto the injectors.
4. Lubricate the NEW O-ring seals with clean engine oil.

Note

Push down firmly on both sides of the rail until all the injectors have been seated into their bores.

5. Install the fuel rail.

Engine Block Valley Cover Replacement|Page 3919 > < Engine Block Valley Cover Replacement|Page 3917