Silverado 2500 2WD V8-8.1L VIN G (2005)
1. Align the tabs (8) on the new wiring harness U-channel with the solenoid retainer slots for solenoids E (3) and D (2) on the control valve assembly.
Install the solenoid retainers (14) for the E (3) and D (4) solenoids.
2. Important: The internal wiring harness connectors (7), (9)-(13), and (15) should be in the correct position for installation because of their
pre-assembled position in the U-channel.
Attach the internal wiring harness connectors to solenoids A through F and to the pressure switch assembly.
^
Connector (13) goes to solenoid (6).
^
Connector (12) goes to solenoid (4).
^
Connector (7) goes to solenoid (5).
^
Connector (10) goes to solenoid (2).
^
Connector (11) goes to solenoid (3).
^
Connector (9) goes to solenoid (1).
^
Connector (15) goes to solenoid (16)
3. Push the main transmission connector (2) outward through hole (1) in the main housing until the retaining "feet" on the connector are near the
locked position.