chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Positive and Negative 14-Volt Battery Cable Replacement (5.3L Engine w/RPO HP2)|Page 5708 > < Positive and Negative 14-Volt Battery Cable Replacement (5.3L Engine w/RPO HP2)|Page 5706
Page 4
background image

8.  Position the wiring harness ground (3) and battery cable ground (1).
9.  Install the engine wiring harness ground/negative cable bolt (2).

Tighten the bolt to 25 N.m (18 lb ft).

10.  Lower the vehicle.

11.  Install the 14V positive/negative cable clips (1) to the frame.

12.  Connect the 14V positive/negative battery cable.
13.  Install the red CPA retainer.
14.  Tighten the 14V positive/negative battery cable bolt (1).

Tighten the bolt to 9 N.m (80 lb in).

Positive and Negative 14-Volt Battery Cable Replacement (5.3L Engine w/RPO HP2)|Page 5708 > < Positive and Negative 14-Volt Battery Cable Replacement (5.3L Engine w/RPO HP2)|Page 5706