chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Ignition Coil|Diagrams|Page 10961 > < Ignition Coil|Diagrams|Page 10959
Page 4
background image

3. If equipped with RPO HP2, position the cable (w/bracket) and install the 3-phase cable bracket to the studs.
4. Install the 3-phase cable bracket nuts (2).

Tighten the nuts to 15 N.m (11 lb ft).

5. If equipped with RPO HP2, install the 3-phase cable to the SGCM.
6. Install the 3-phase cable nuts to the SGCM.

Tighten the nuts to 9 N.m (80 lb in).

7. Install the SGCM cover and bolts.

Tighten the bolts to 9 N.m (80 lb in).

Ignition Coil|Diagrams|Page 10961 > < Ignition Coil|Diagrams|Page 10959