chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Power and Ground Distribution > < Electrical - Various Electrical Malfunction/Systems Inop|Page 17845
Page 21
background image

34. Remove the tape from the turbocharger openings.

IMPORTANT:  Lubricate the end of the duct prior to installation.

35. Install the charged air cooler inlet duct connector (4) to the turbocharger.
36. Tighten the charged air cooler inlet duct connector to turbocharger clamp (1).

Tighten the clamp to 6 N.m (53 lb in).

37. Install a NEW quick connect fitting clip to the charged air cooler duct.
38. Install the charged air cooler outlet duct to the intake.
39. Install the air cleaner outlet duct.
40. Install both front wheelhouse panels.
41. Install the intake manifold cover.
42. Connect the negative battery cable.

Power and Ground Distribution > < Electrical - Various Electrical Malfunction/Systems Inop|Page 17845