Tahoe 2WD V8-6.0L Hybrid (2008)
21. Position the generator control module 3 phase cables to the bracket channel.
22. Install the generator control module 3 phase cable clip to the tab (3) on the engine bracket (2).
23. Install the generator control module 3 phase cable clip nut (1).
Tighten the nut to 9 N.m (80 lb in).
24. Enable the high voltage. Refer to High Voltage Enabling .
25. Install the intake manifold cover. Refer to Upper Intake Manifold Sight Shield Replacement (See: Intake Manifold/Service and Repair) .