Tahoe 2WD V8-6.0L Hybrid (2008)
23. Connect the drive motor generator control module assembly connector (1).
24. Fill the power electronics cooling system and test for leaks at all serviced connections. Refer to Generator Control Module Cooling System
Draining and Filling.
25. Install the sight shield.
26. Install the fender cross brace.
Danger: Ensure all High Voltage safety procedures are followed. Failure to follow the procedure exactly as written may result in serious
injury or death.
27. Perform the High Voltage Enabling procedure. Refer to High Voltage Enabling. See: Service and Repair/Procedures/Hybrid Energy Storage/High
Voltage Enabling
28. Install the air cleaner.