chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Hybrid Controls|Page 7585 > < Hybrid Controls|Page 7583
Page 11
background image

Caution:  Always remove and install the High Voltage terminal fasteners with a magnet tipped socket. Never touch the exposed electronic
circuit board surface or components. Dropped fasteners or physical contact may result in electronic circuit board damage.

16. Install the high voltage (HV) dc battery cable terminal fasteners (2).

Tighten the terminal fastener to 9 N.m (80 lb in).

17. Install the HV dc electric air conditioning compressor module (ACCM) cable (4) into the PIM distribution box with a new seal (7).
18. Install the HV dc electric ACCM cable mounting fasteners (3).

Tighten the mounting fasteners to XX N.m.

Caution:  Always remove and install the High Voltage terminal fasteners with a magnet tipped socket. Never touch the exposed electronic
circuit board surface or components. Dropped fasteners or physical contact may result in electronic circuit board damage.

19. Install the HV dc electric ACCM cable terminal fasteners (1).

Tighten the terminal fastener to 9 N.m (80 lb in).

20. Install a new seal (3) on the PIM distribution box.
21. Position the terminal cover (2) onto the PIM distribution box ensuring the seal remains in place.
22. Tighten the terminal cover fasteners (1).

Tighten the fasteners to 4.7 N.m (41.6 lb in).

Hybrid Controls|Page 7585 > < Hybrid Controls|Page 7583